Velodrome:
All you need to know about the Games cycling venue
The Veldodrome is arguably the most aesthetically-pleasing venue of the Games.
The
360-degree glass wall between the lower concrete and upper tiers will
give fans a view across the Olympic Park as well as allowing people
outside the Velodrome to look in.
Construction began on in 2008 and was completed in February 2011.
Location: In the north of the Olympic Park
Capacity: 6,000
Sport: Track cycling and BMX
Cost: £94m
Schedule: Track cycling: Aug 2 – Aug 7 BMX: Aug 9 – Aug 10
First event: Men’s Team Pursuit qualifying (Aug 2)
Transport: Stratford (National Rail, London Underground, DLR)
West Ham (London Underground, National Rail)
Did you know?
- Olympic legend Sir Chris Hoy was consulted as part of the design process.
- Nicknamed ‘The Pringle’ because of its crisp-like shape, it is the most sustainable venue in the Park.
- Ventilation is 100 per cent natural, providing a perfect track-level temperature.
- A mountain bike course and road circuit will be added post-Games to create a permanent VeloPark.
Legacy
After
the Games a mountain bike course and road-cycle circuit will be added
to create a community for sports club and elite athletes.
It will also include bike hire and workshop facilities.
Aquatics Centre:
All you need to know about the swimming venue
Designed by renowned architect Zaha Hadid, the Aquatics Centre was completed in July 2011 at an estimated cost of £269million.
It plays host to a 50m competition pool, 25m diving pool and warm-up area for the competitors.

Location: South-east corner of the Olympic Park
Capacity: 17,500
Sport: Diving, Swimming, Synchronised Swimming, Modern Pentathlon
Cost: £268m
First event: Men’s 100m breaststroke heats (July 28)
Schedule: Diving: July 29 – Aug 11
Swimming: July 28 – Aug 4
Synchronised swimming: Aug 5 – Aug 10
Modern Pentathlon: Aug 11– Aug 12
Transport: Stratford (National Rail, London Underground, DLR)
West Ham (London Underground, National Rail)


Did you know?
- The roof, which measures at 160m long and up to 80m wide, has a longer single span than Heathrow Terminal 5.
- Pool water will be reused to flush the venue's toilets.
- A permanent venue that will be extended temporarily during the Games.
Legacy
The two temporary wings will be removed, reducing the capacity to 3,500.
The venue will be used by the local community, clubs, schools and elite swimmers.
Basketball Arena:
All you need to know about the venue built for heights
The Basketball Arena will play host to the basketball and handball.
Organisers will have a turnaround of just 22 hours to prepare the venue
for five days of handball action following the basketball.
The venue was completed in less than two years and was within budget at £42million.
Location: North section of the Olympic Park
Capacity: 12,000
Sport: Basketball, Handball
Cost: £42m
First event: Opening matches (July 28)
Schedule: Basketball: July 28 – Aug 7
Handball: Aug 8 – Aug 12
Transport: Stratford (National Rail, London Underground, DLR)
West Ham (London Underground, National Rail)
Did you know?
- To accommodate the athletes, all the doors inside the venue are required to be an above average 2.4m high
- It is one of the largest-ever temporary venues built for any Games
Legacy
The Basketball Arena is a temporary venue and will be dismantled after the Games.
Most of the materials will be recycled or reused in other parts of the country.